{"id":1779,"date":"2020-11-29T12:23:32","date_gmt":"2020-11-29T08:23:32","guid":{"rendered":"https:\/\/qia.az\/en\/?p=1779"},"modified":"2020-11-29T12:23:33","modified_gmt":"2020-11-29T08:23:33","slug":"azerbaijans-renewable-energy-talks-with-uae-saudi-arabia-nearing-completion","status":"publish","type":"post","link":"https:\/\/qia.az\/en\/azerbaijans-renewable-energy-talks-with-uae-saudi-arabia-nearing-completion\/","title":{"rendered":"Azerbaijan&#8217;s renewable energy talks with UAE, Saudi Arabia nearing completion"},"content":{"rendered":"\n<p>Negotiations between the Azerbaijan&#8217;s Energy Ministry, the United Arab Emirates\u2019 Masdar company and Saudi Arabia\u2019s ACWA Power company on the project documentation in the field of use of renewable energy sources are in the final stage and will be completed in the near future.<\/p>\n\n\n\n<p>This was stated at&nbsp;the fourth meeting of the commission \u201con the implementation of pilot projects in the field of use of renewable energy sources\u201d held on November 26.<\/p>\n\n\n\n<p>During the videoconference meeting,&nbsp;the implementation progress of pilot projects since the third meeting of the commission and the approval of&nbsp;the final draft agreements to be signed with ACWA Power were reviewed.<\/p>\n\n\n\n<p>Azerbaijan Energy Minister Parviz Shahbazov briefed the participants of the work done jointly with relevant organizations to allocate land areas for the implementation of the wind and solar power projects, connect to the network and integrate in the energy system and determine the mechanism of issuing public guarantees.<\/p>\n\n\n\n<p>It was noted that six agreements to be signed with ACWA Power- the&nbsp;investment agreement, the power purchase and sale agreement, the transmission network connection agreement, the land lease agreement, the independent engineering agreement and the direct agreement had been&nbsp;drafted. In addition, it was stated that in the second stage the feedbacks and suggestions from the relevant organizations had been received, improved and agreed with the investors.<\/p>\n\n\n\n<p>Representatives of the Ministries of Energy, Economy, Finance, Justice, Ecology and Natural Resources, Emergency Situations, Committee of Urban Planning and Architecture, Central Bank, Azerenergy&nbsp;and Azerishig&nbsp;OJSC attended the video conference.<\/p>\n\n\n\n<p>&#8212;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Negotiations between the Azerbaijan&#8217;s Energy Ministry, the United Arab Emirates\u2019 Masdar company and Saudi Arabia\u2019s ACWA Power company on the project documentation in the field of use of renewable energy sources are in the final stage and will be completed in the near future. This was stated at&nbsp;the fourth meeting of the commission \u201con the&hellip; <a class=\"more-link\" href=\"https:\/\/qia.az\/en\/azerbaijans-renewable-energy-talks-with-uae-saudi-arabia-nearing-completion\/\">Continue reading <span class=\"screen-reader-text\">Azerbaijan&#8217;s renewable energy talks with UAE, Saudi Arabia nearing completion<\/span><\/a><\/p>\n","protected":false},"author":4,"featured_media":1781,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1779","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","entry"],"_links":{"self":[{"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/posts\/1779","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/comments?post=1779"}],"version-history":[{"count":0,"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/posts\/1779\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/media\/1781"}],"wp:attachment":[{"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/media?parent=1779"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/categories?post=1779"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qia.az\/en\/wp-json\/wp\/v2\/tags?post=1779"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}